From our 2024 article archive. The text has been adapted into English. Model configurations and project arrangements are confirmed with your quotation.
Manufacture before delivery
A prefabricated unit brings much of the assembly work into the workshop. It is transported to the destination and positioned according to the agreed site plan.
Plan the site work
The original article describes rapid lifting and installation. Actual timing depends on the model, access, prepared supports, utility connections, equipment and local conditions. It is confirmed for the project.
A modular approach
A collection of individual units can be planned around the destination. Transport and lifting arrangements must also be considered if relocation is part of the brief.
Choose the right materials
The archive discusses steel and fiberglass construction in general terms. Our current product pages set out the reference materials for each model; different formats should not be treated as having identical construction.
Equipment for the stay
Lighting, climate control, smart controls and interior furnishings can be coordinated as a package. Confirm the inclusion list with the quotation.
